
Most structural problems in houses start long before any crack appears. They start on the day the slab is cast — when reinforcement that doesn't match the drawings disappears under concrete.
Why this stage matters
After casting, you can't see or correct the steel without breaking the slab. A short check before the pour is the cheapest insurance you can buy.
What to check
- Bar diameter and count match the structural drawing for each span.
- Spacing between bars is within the specified limits.
- Cover blocks are placed so the steel sits at the correct depth.
- Laps and anchorage are long enough and staggered.
- Extra bars at openings, cantilevers and supports are in place.
- Shuttering is level, tight and properly propped.
- Electrical conduits don't displace the steel.
If something is wrong, it's far cheaper to fix it today than after the concrete has set.
Before you pour
- Keep the approved structural drawing on site
- Clean the formwork of debris and binding wire
- Plan the pour so it isn't interrupted
Want an engineer to check it for you? Book a site visit before the next pour.
Watch: a slab reinforcement check
Video: Er. Mahendra Joshi (joshi-construction work) on YouTube.


