How it's calculated
- In-place volume = length × width × depth × number.
- Loose volume = in-place volume × (1 + swell %).
- Trips = loose volume ÷ truck capacity, rounded up.
Area & volume
Volume of earth to dig for a pit or trench, the loose (swelled) volume to cart away and truck trips.
Excavation (in-place volume)
22.500 m³
794.58 cft
Estimates for planning. Confirm final quantities from drawings with an engineer.
Footings are usually excavated wider than the footing itself to leave working space (often 150–300 mm on each side), so use the excavation size, not the footing size. Deep trenches in loose soil need shoring.
An independent engineer checks materials, steel and workmanship against your drawings.