Area & volume

Excavation Calculator

Volume of earth to dig for a pit or trench, the loose (swelled) volume to cart away and truck trips.

m
m
m

Loose soil takes more space: ~10–15% sand, 20–30% common soil, 30–45% clay or rock.

%
m³

Excavation (in-place volume)

22.500 m³

794.58 cft

Loose volume to remove
28.125 m³ (993.23 cft)
Truck trips
5

Estimates for planning. Confirm final quantities from drawings with an engineer.

How it's calculated

  1. In-place volume = length × width × depth × number.
  2. Loose volume = in-place volume × (1 + swell %).
  3. Trips = loose volume ÷ truck capacity, rounded up.

Good to know

Footings are usually excavated wider than the footing itself to leave working space (often 150–300 mm on each side), so use the excavation size, not the footing size. Deep trenches in loose soil need shoring.

Get your quantities checked on site

An independent engineer checks materials, steel and workmanship against your drawings.