How it's calculated
- Volume = length × width × compacted thickness.
- Weight = volume × density (hot-mix asphalt ≈ 2.32 t/m³, i.e. 145 lb/ft³).
Area & volume
Tonnes of hot-mix asphalt (bitumen) needed for a driveway, parking area or road patch.
Asphalt required
9.28 tonnes
4.000 m³ compacted
Estimates for planning. Confirm final quantities from drawings with an engineer.
Driveways typically need 50–75 mm of asphalt over a well-compacted granular base. Add 5–10% for edges and handling losses.
An independent engineer checks materials, steel and workmanship against your drawings.