Skip to content

Area & volume

Asphalt Calculator

Tonnes of hot-mix asphalt (bitumen) needed for a driveway, parking area or road patch.

m
m
mm
t/m³

Asphalt required

9.28 tonnes

4.000 m³ compacted

Area
80.00 m² (861.11 sq ft)

Estimates for planning. Confirm final quantities from drawings with an engineer.

How it's calculated

  1. Volume = length × width × compacted thickness.
  2. Weight = volume × density (hot-mix asphalt ≈ 2.32 t/m³, i.e. 145 lb/ft³).

Good to know

Driveways typically need 50–75 mm of asphalt over a well-compacted granular base. Add 5–10% for edges and handling losses.

Get your quantities checked on site

An independent engineer checks materials, steel and workmanship against your drawings.