How it's calculated
- Volume = π × (diameter ÷ 2)² × height × number of tubes.
- Site mix: dry volume = wet × 1.54, split by the mix ratio.
- Premix bag yield taken as 0.0187 m³ per 40 kg and 0.0117 m³ per 25 kg; check your brand's yield.
Quantity estimator
Concrete for round form tubes (sonotubes) for piers and posts, in volume, cement bags or premix bags.
Concrete volume
0.339 m³
11.98 cft · 0.444 cubic yards
Estimates for planning. Confirm final quantities from drawings with an engineer.
Fill tubes in layers and rod or vibrate each layer. Brace the tube so it stays plumb while the concrete is placed.
An independent engineer checks materials, steel and workmanship against your drawings.