Skip to content

Quantity estimator

Round Column Calculator

Concrete volume and cement, sand and aggregate for circular columns.

m
m

Concrete volume

0.477 m³

16.85 cft for 1 column

Materials for M20

Cement
3.85 bags (192 kg)
Sand
0.200 m³ (7.08 cft)
Aggregate
0.401 m³ (14.15 cft)

Estimates for planning. Confirm final quantities from drawings with an engineer.

How it's calculated

  1. Volume = π × (diameter ÷ 2)² × height × number of columns.
  2. Dry volume = wet × 1.54, split by the mix ratio; cement at 1,440 kg/m³, 50 kg per bag.

Good to know

Columns are usually M20 or higher. Use cover blocks so the steel has the specified cover (typically 40 mm in columns) and compact the concrete well with a needle vibrator.

Get your quantities checked on site

An independent engineer checks materials, steel and workmanship against your drawings.