How it's calculated
- Total cost = built-up area × cost per sq ft.
- Cost split: cement 16.4%, sand 12.3%, aggregate 7.4%, steel 24.6%, finishes 16.5%, fittings 22.8% (sums to 100%).
- Quantities per sq ft: cement 0.35–0.45 bags, sand 1.2–1.6 cft, aggregate 1.5–2.0 cft, steel 3–4 kg, bricks 8–10, paint 0.12–0.18 L, tiles 1.0–1.1 sq ft. The middle of each range is shown first.